Concept designs

Energy & utilities

Choose a problem to see how the systems could work together.

Finding life-support registration gaps across retailer and distributor records

A retailer can record a notification under a customer account while the distributor plans an interruption against a supply point. A move, renumbered address or unacknowledged message can break the connection between the two records.

See the proposed design

Scope of this study

Retailer and distributor records hold life-support events against the supply point. Acknowledgements identify which registrations are accepted or still outstanding.

Proposed architecture

Link registration events, supply identifiers, address changes and counterparty acknowledgements. Give the protection team a time-ordered discrepancy list and a controlled route to investigate before planned-work communications are finalised.

Event sequence Select a step for details
  1. Source recordsRegistration and supply-point events
  2. ProcessingCheck counterparty acknowledgement
  3. Decision ownerLife-support team
  4. Operational outputReviewed protection record

Reliability and operating controls

A trained officer verifies uncertain identity and applies the approved safeguarding process. Restrict access to sensitive registration details. Silence from a counterparty must never trigger automatic removal.

Illustrative operating scenario

An account closes at one address while a registration update for another unit is pending. The team sees both events and confirms the relevant supply point directly.

Delivery boundaries

A trained officer resolves identity gaps and follows the approved protection process. Unacknowledged records stay active for follow-up.

Expected business impact

Make mismatched supply-point records visible before planned-work notices are issued.

Acceptance test and handover

Test unit-number ambiguity, retailer transfer and delayed acceptance. Review unresolved registrations before a simulated outage communication run without sending messages to actual customers.

Industry context and design references

The AER wrote to retailers and distributors about an enforcement outcome involving life-support obligations. Australian Energy Regulator enforcement letter on life support

Matching installed solar and battery equipment to the approved connection

A network approves one inverter configuration, but the installer fits a permitted replacement or corrects a serial number on site. The connection record, field paperwork and register submission can then describe different equipment.

See the proposed design

Scope of this study

The network holds the approved connection. Commissioning evidence identifies the installed inverter, battery and associated configuration.

Proposed architecture

Map application reference and metering identifier to the installed device, approved limits and commissioning evidence. Compare revisions, prepare the required submission and track acceptance or a specific correction request.

Event sequence Select a step for details
  1. Source recordsConnection and commissioning data
  2. ProcessingMatch installed configuration
  3. Decision ownerNetwork and installer
  4. Operational outputAccepted register update

Reliability and operating controls

The network and authorised installer decide technical acceptance. Preserve replacements and removals as changes to an existing installation. An app submission without acknowledgement remains outstanding.

Illustrative operating scenario

A battery is added to an existing solar installation. The register workflow must update the correct premises and distinguish the added equipment from a full replacement.

Delivery boundaries

The network and authorised installer decide acceptance. Missing acknowledgements and unmatched replacements stay open until the register is reconciled.

Expected business impact

Reduce equipment corrections and duplicate site records after a retrofit or commissioning change.

Acceptance test and handover

Test retrofits, device swaps and a rejected submission. Compare the installed inventory with the accepted record and ensure resubmission cannot create a second installation.

Industry context and design references

AEMO describes the register of distributed energy resource installations and its role in understanding installed equipment. AEMO on the Distributed Energy Resources Register

Controlling rebills when actual meter intervals replace estimates

A meter-data provider can send corrected intervals after the retailer has billed. A late file can arrive out of order and overlap an earlier correction. Replacing the latest total loses the basis of the customer’s original bill.

See the proposed design

Scope of this study

The metering system supplies versioned intervals. The billing system retains the issued bill and the exact meter data used.

Proposed architecture

Keep interval revisions, quality flags, effective tariff and billing cut together. Identify which issued bills are affected, calculate a preview against their original inputs and route material differences through the retailer’s existing review process.

Event sequence Select a step for details
  1. Source recordsInterval versions and issued bill
  2. ProcessingIdentify affected bill periods
  3. Decision ownerMetering and billing leads
  4. Operational outputReviewed rebill instruction

Reliability and operating controls

Metering specialists own data-quality exceptions. Separate duplicate files from genuinely revised intervals and prevent an older estimate from replacing accepted actual data.

Illustrative operating scenario

A meter exchange occurs mid-period and a corrected read arrives for the outgoing device. The bill review applies only to the affected intervals and retains both meter identities.

Delivery boundaries

Metering approves treatment of data-quality exceptions. Billing approves a rebill only once the accepted correction and affected periods are clear.

Expected business impact

Show which bills need review when meter data changes and preserve the original billing basis.

Acceptance test and handover

Replay an out-of-order correction and a repeated delivery. Compare the recalculated intervals, authorisation and subsequent bill adjustment to the recorded original.

Industry context and design references

AEMO describes validation, substitution and estimation of metering data. Applicable procedure versions must be checked for the relevant interval. AEMO Metrology Procedure Part B

Systems commonly involved

Discuss a workflow All case studies