Concept designs

Mining & resources

Choose a problem to see how the systems could work together.

Tracing a stockpile blend from laboratory sample to shipment

Mine planning tracks material movements, the laboratory reports samples and the port builds a cargo. A late assay or changed stockpile identity can leave commercial and operational teams using different estimates of the same parcel.

See the proposed design

Scope of this study

Stock movement records identify parcels and transfers. Laboratory assays and the load plan connect selected samples and quantities to the staged cargo.

Proposed architecture

Build a lineage record for material movement, stockpile additions and reclaim, sample collection, assay revision and shipment assignment. Preserve when the sample was taken and when its result became available to the planner.

Event sequence Select a step for details
  1. Source recordsMovement and assay records
  2. ProcessingReconstruct material lineage
  3. Decision ownerMetallurgy and planning
  4. Operational outputReviewed cargo quality record

Reliability and operating controls

Metallurgy staff approve quality interpretation and treatment of missing or unrepresentative samples. Show estimated and measured quantities separately, including the basis for moisture conversion.

Illustrative operating scenario

An assay is revised after part of a stockpile has been reclaimed. The planner can identify which cargo estimates depended on the earlier value and which loads were unaffected.

Delivery boundaries

Metallurgy decides treatment of unrepresentative samples and quality estimates. Planning records any approved blend changes before cargo results are issued.

Expected business impact

Identify which parcels and cargo estimates relied on an earlier assay rather than revisiting the full stockyard history.

Acceptance test and handover

Trace a sample of shipped parcels in both directions. Review unexplained material, timing differences and uncertainty with metallurgy and commercial leads before using the data in shipment decisions.

Industry context and design references

The authors examine how sampling quality affects the ability to compare material through a mining operation. AusIMM technical paper on sampling station quality

Rio Tinto describes the port facilities that link its iron ore operations with export shipping. Rio Tinto · Pilbara rail and port operations

Converting a fleet condition alert into executable maintenance work

A remote monitoring team can see a developing equipment issue while the mine plan still allocates the machine and the maintenance system has no parts or access window reserved. More alerts can increase the backlog without changing asset availability.

See the proposed design

Scope of this study

Condition monitoring links sensor history to a known component. Maintenance records identify inspection windows and confirmed work.

Proposed architecture

Link the condition evidence to the actual equipment and component, existing maintenance strategy, parts availability and next feasible work window. Group repeat indications against an active investigation and retain the trend behind the recommendation.

Event sequence Select a step for details
  1. Source recordsCondition trends and component IDs
  2. ProcessingLink to executable work
  3. Decision ownerReliability engineer
  4. Operational outputPlanned inspection or repair

Reliability and operating controls

The reliability engineer confirms the diagnosis and site personnel decide how to manage the asset. Never turn a sensor alert directly into equipment control. Escalate missing context or a maintenance deferral with a named owner.

Illustrative operating scenario

A monitored component moves between units. The reliability lead traces the serialised component history before asking planners to reserve parts for the correct machine.

Delivery boundaries

Reliability engineering assesses the diagnosis. Site personnel own work and safety decisions. Deferred tasks keep a named escalation owner.

Expected business impact

Convert condition evidence into planned inspection or repair within an actual maintenance window.

Acceptance test and handover

Review past alerts through inspection, work order and verified repair. Track repeated unsupported alerts, actions deferred without review and faults where the monitoring data stopped unexpectedly.

Industry context and design references

BHP’s article provides operator context for using data in mining decisions. The equipment work in this concept still needs local engineering records and authority. BHP · Data and AI in mining operations

The model code covers plant across its lifecycle, including installation, commissioning, alteration and maintenance. Safe Work Australia on plant risk management

Replanning ore movements after rail or port availability changes

A mine, train operator and port terminal may each publish a valid local plan. When a planned train path moves, stockpile capacity and vessel loading commitments can cease to match across the network.

See the proposed design

Scope of this study

Mine, rail and port records identify stock on hand, forecast production and available movement capacity. The movement plan records accepted changes.

Proposed architecture

Create a shared view of parcel readiness, planned movements, feasible receiving capacity and nominated shipment. Version each planning assumption and record which counterparties accepted a revised movement.

Event sequence Select a step for details
  1. Source recordsMine, rail and port plans
  2. ProcessingTrace changed dependencies
  3. Decision ownerSupply-chain planner
  4. Operational outputAccepted movement revision

Reliability and operating controls

Dispatchers and authorised rail and port teams retain operating authority. Keep physical inventory, forecast production and confirmed capacity distinct. Flag a plan that depends on an unconfirmed handoff.

Illustrative operating scenario

A vessel call shifts while an inbound parcel is still moving. The supply planner sees which stockpile was reserved, what could be displaced and which sites need to accept a revised sequence.

Delivery boundaries

Supply-chain planning proposes revisions. Dispatch, rail and port teams accept operational changes within their own authority.

Expected business impact

Expose shipping and stockpile constraints before counterparties commit to an infeasible movement.

Acceptance test and handover

Replay a disruption across multiple shifts. Trace missed commitments to their first changed dependency and test the fallback when one site’s planning feed stops.

Industry context and design references

Rio Tinto describes the port facilities that link its iron ore operations with export shipping. Rio Tinto · Pilbara rail and port operations

Systems commonly involved

Discuss a workflow All case studies