Concept designs

Water & wastewater

Choose a problem to see how the systems could work together.

Prioritising leakage investigations and checking flow after repair

District-meter flows can indicate a change, but planned network reconfiguration, meter drift and legitimate demand can produce similar signals. A work order marked repaired is insufficient evidence that the original loss was addressed.

See the proposed design

Scope of this study

District meters supply flow histories. Geographic records identify the active district boundary and field tickets identify what was actually repaired.

Proposed architecture

Connect district boundaries, meter status, comparable demand periods, known operational changes and field findings. Rank investigations for the network team and link completed repairs back to the original observation window.

Event sequence Select a step for details
  1. Source recordsDistrict flow and GIS boundaries
  2. ProcessingCheck demand and network changes
  3. Decision ownerNetwork operations
  4. Operational outputVerified investigation outcome

Reliability and operating controls

Operators confirm the effective network configuration and field crew priorities. Flag boundary or meter changes that invalidate comparison and keep uncertain estimates separate from verified physical findings.

Illustrative operating scenario

Night flow rises after two zones are temporarily linked. The review shows the boundary change before dispatch; a separate persistent rise in a stable zone remains available for field investigation.

Delivery boundaries

Network operators approve priorities and confirm configuration. Field results and estimated leakage are evaluated separately before a repair outcome is accepted.

Expected business impact

Reduce avoidable investigation dispatch and verify the effect of completed work under comparable conditions.

Acceptance test and handover

Compare flagged events with confirmed repairs and valid post-repair periods. Keep observed flow change separate from a causally verified reduction. Document demand changes, meter uncertainty and remaining alternative explanations.

Industry context and design references

Sydney Water reports on leakage management as part of its wider water conservation programme. Sydney Water water conservation plan and performance report

Following a water-quality sample from collection to reviewed result

The sampling plan, field label and laboratory system can each identify a location differently. A corrected result or invalid sample can arrive after an operations team has already reviewed the original report.

See the proposed design

Scope of this study

The sampling plan identifies a site and window. Collection custody, laboratory accession and result revisions remain linked in the monitoring record.

Proposed architecture

Create an event history from scheduled sample to collection, chain of custody, laboratory accession, result revision and authorised review. Cross-reference sampling points to the relevant network location and effective monitoring plan.

Event sequence Select a step for details
  1. Source recordsSampling plan and custody record
  2. ProcessingMatch accession and revisions
  3. Decision ownerWater-quality officer
  4. Operational outputReviewed monitoring evidence

Reliability and operating controls

The water-quality team interprets results and owns escalation under its approved procedures. Flag missing or compromised evidence and late revisions without inferring water safety from a single reading.

Illustrative operating scenario

The laboratory issues a corrected report after a sample label was resolved. Operations receives the update against the original sample and records the authorised review of the replacement.

Delivery boundaries

Water-quality staff interpret results and own escalation. An unresolved custody issue or a revised result sends the sample back for review.

Expected business impact

Keep an unreviewed or superseded result visible until the authorised team addresses it.

Acceptance test and handover

Test late arrival, recollection and corrected results. Trace from a published internal report back to the exact result version and confirm unresolved samples remain visible.

Industry context and design references

The guidelines distinguish monitoring activities and provide a framework for verification of drinking water quality. NHMRC · Australian Drinking Water Guidelines on monitoring

Bringing a new main or pump asset into operational records

A project may reach practical completion before corrected as-built geometry, equipment identifiers and service obligations reach GIS and maintenance. A field crew can be dispatched against a proposed drawing after the installation changed.

See the proposed design

Scope of this study

Commissioning and surveyed drawings identify what was installed. The utility asset register and network map retain accepted identifiers and connectivity.

Proposed architecture

Map construction submission, survey geometry, commissioning evidence and equipment schedules to the operating register. Compare the accepted as-built revision with the design and identify affected maintenance routes and spare-parts records.

Event sequence Select a step for details
  1. Source recordsAs-constructed and commissioning files
  2. ProcessingValidate spatial and asset IDs
  3. Decision ownerUtility asset custodian
  4. Operational outputAccepted operating register

Reliability and operating controls

The utility’s asset custodian accepts or rejects the handover. Record provisional assets separately and retain the survey or drawing source. GPS proximity alone cannot confirm the correct network connection.

Illustrative operating scenario

A pipe section is rerouted around an obstruction. The handover identifies which connection changed and which maintenance map still shows the original design before field release.

Delivery boundaries

The asset custodian confirms the handover. Provisional geometry stays visible to reviewers until a survey or accepted drawing establishes the connection.

Expected business impact

Give field crews the accepted installation record and avoid retaining design geometry as operational fact.

Acceptance test and handover

Sample assets from approved records in the field and trace back to signed handover evidence. Rehearse a corrected survey and verify that the superseded record cannot re-enter the operating map.

Industry context and design references

Sydney Water specifies the asset information required when construction records are submitted for handover. Sydney Water work-as-constructed asset information specification

Systems commonly involved

Discuss a workflow All case studies